Case studies
Three situations from a real 302-room hotel, showing what each role sees in Floorstate.
- Read the case study
Checkout rush: 48 rooms before 3 pm
A busy Saturday morning, seen as 48 rooms move through housekeeping and inspection.
- Read the case study
Room 214: a leak from first sight to fixed
One fault, logged as a work order with a photo at 09:40 and traced through assignment, repair and record.
- Read the case study
Shift handover with 11 open work orders
The 15:00 maintenance changeover, when the open backlog usually gets lost or repeated.
Want to see your own floors like this?
Send your room count and we will show you what it would look like on your property.