Shift handover with 11 open work orders

The 15:00 maintenance changeover, when the open backlog usually gets lost or repeated.

The situation

The morning maintenance shift ends at 15:00 and the evening shift starts. 11 work orders are still open: 2 High, 5 Medium and 4 Low. Without a shared backlog, the outgoing team has to remember and explain each one.

What each role sees

Outgoing shift
Every work order they still own, so nothing has to be recalled from memory.
Incoming shift
The full backlog ranked by priority, each work order with its room and photo.
Management
Open work orders counted by priority, and how many are unassigned.

How it plays out

  1. The outgoing lead opens the open work orders list. 11 open: 2 High, 5 Medium, 4 Low.
  2. The two High work orders are assigned to evening staff before the handover meeting starts.
  3. The evening shift logs in and each person sees their own work orders with photos and rooms.
  4. Management sees 11 open work orders, all assigned, none unassigned.

What to take from it

A handover stops being a conversation people have to remember. The backlog is the handover, and it is the same list for both shifts and for management.

Request a walkthrough